Trail Work Report

We were out installing the sign posts for the new signs. The members there were Dave, Mike, Bill, John and myself. We installed 10 posts. Dave borrowed a pounder to drive the signs in. Some spots we had to try several times to find a spot where the post would go in. We also realized hearing protectors would have been really nice. John did all the pounding as his height and size was needed for getting the pounder on and off the top of the posts. I want to thank every one that helped. We needed at least 4 people to make it work.

Bill and John installing the new top pieces.

John,Bill, mike and Dave driving the post in. As you can see it was not an easy task!

John, Mike and Dave after installing the last post on the upper trail.