Trail work day this Sunday update.

We will be installing the runners on the Gagnon Bridge in Wheelerville. We will meet at the City Gate at 8:00 AM.  If you do not know where that is give me a call at 775-3406. It is not too far from the  US Route 4 end and I will have a yellow VAST arrow at the gate. If you are coming a little later give me a call also. I do not think it is going to be a long project so I do not want you to get there after it is done.

On the Tucker maintenance, the exhaust manifold I got was not the correct one but it coming now. Dad and I did check all the wheels and replaced the bad ones and checked the bearings and they seemed ok. We then tightened  the tracks and greased it. Saturday we will change the fluids and filters if things go as planed. We also straightened the right front corner of the blade because I had the shops torches there and Dad pulled with his tractor.

The next weekend I am planning on replacing the exhaust manifold. After that we will be doing more on the trails, If any one has time to do trail work when I can not go let me know and I will post it to try and get you some help! This always turns out to be a very busy time for every one.

Hope to see you out there on the trails! Fall is one of the best times of the year, the smells and colors make the work worth while!

 

 

1 comments

    • Scott Ryan on September 24, 2019 at 6:51 am

    are we nailing or screwing down the runners? i can bring a generator, extension cord, air compressor, nail gun, chop saw or whatever else we might need. Please let me know. Thank you, Scott Ryan

Comments have been disabled.